Upcoming Projects

Project Name County Project Summary Approx Bid Date
Sunrise Peak Juab Closure of approximately 27 mine openings on private land with backfill and rebar grates. Spring 2019
Clear Creek Refuse Carbon Project will remove and bury coal refuse that has been eroded by surface runoff creating deep gullies and washing into the creek. Stable drainage channels will be established and the area revegetated to prevent further erosion and improve water quality. Summer 2019
Hiawatha Phase II Carbon Reclamation of approximately 100,000 cubic yards of coal refuse piles on private land. Summer 2019
Rilda Canyon Springs Emery Spring development project will create natural springs in Huntington Canyon by installing three boxes to collect groundwater for culinary use in Huntington. Summer 2019
Spor Mountain Juab Closure of approximately 81 hardrock mine openings, pits and trenches on public and private land with backfill, barricades, steel mesh, walls, and bat gates. 2019
Willard Peak Box Elder Closure of approximately 50 hardrock mine openings with steel grates and block walls. Fall 2019
Buckmaster Draw Emery Closure of approximately 46 uranium mine openings on public land with backfill, walls, grates, and bat gates. Fall 2019
Red Canyon San Juan Closure of approximately 135 uranium mine openings on public land with backfill, walls, grates, and bat gates. Fall 2019
Topache Peak Beaver Closure of apporximately 296 hardrock mine openings on public and private land with backfill, walls, grates and bat gates. 2020
Picacho Peak Beaver Closure of approximately 182 hardrock mine openings on public and private land with backfill, walls, grates and bat gates. 2020 & 2021


Awarded Contracts

Construction

Project Name County Bid Number Engineer Estimate Bid Results Awarded To Construction Start Final Contract Amount
Honorine Portal Tooele CN19017 $40-45,000 $48,400 Xcavation Company Winter 2018 --
Hiawatha Phase 1 Carbon/Emery MG19016 $175,000 $158,894 5 Seventeen Company Fall 2018 --
Dutch Mountain Tooele CN18207 $300,000 $326,465 5 Seventeen Company Spring 2018 --
Browns Hole San Juan MG19009 $235,000 $234,996 5 Seventeen Company Fall 2018 $234,996
Chief #1 Subsidence Juab CN19032 $220-240,000 $105,449 Nelco Fall 2018 $229,728
Poverty Flat Sevier CN18249 $13,500 $24,445 5 Seventeen Company Summer 2018 $24,445
Prince of Wales Salt Lake CN19015 $50,000 $78,885 5 Seventeen Company Summer 2018 $78,885
Kenilworth Maintenance Carbon CN18177 $1.9-2.1 Million $1,927,151 Nelco Spring 2018 $2,047,362
Trash Canyon Mintenance Carbon CN17061 NA $105,449 Nelco Spring 2017 $137,619
Farnsworth Tooele CN17006 $211,001 - $234,446 $196,657 5 Seventeen Company 9/27/2016 $222,445
Lower Willow Creek Carbon CN17030 $468,000 - $520,000 $313,119 Harrison Oil Field Services 10/31/2016 $310,277
Diamond Gulch East Mine Closure Juab AR16134 $88,000 - $93,000 $85,075 5 Seventeen Company 04/11/2016 $94,820
Copper Ridge Mine Closure Grand AR16092 $75,000 - $85,000 $43,068 5 Seventeen Company 11/16/2015 $44,427
Wolf Den Gilsonite Fire Uintah AR15167 $150,000 - $180,000 $176,119 Harrison Oil Field Service 08/11/2015 $146,336
Morrison Coal Mine Reclamation Sanpete AR15074 $225,000 - $250,000 $181,450 Harrison Oil Field Service 11/17/2014 $205,037
San Rafael Swell South Mine Closures Emery AR15027 $825,000 - $900,000 $727,529 Kent Bethers Construction 10/15/2014 $856,900
Crawford Mountains Mine Closure Maintenance Rich BV15004 $350,000 - $450,000 $295,713 ET Technologies 9/15/2014 $312,894
Foothills Mine Closures Davis, Salt Lake AR15007 $25,000 - $35,000 $48,715 5 Seventeen Company 8/25/2014 $49,395
Paria Coal Mine Closure Garfield AR14174 $7,771 $9,816 5 Seventeen Company 6/24/2014 $9,530
Miners Mountain Shaft Closure Wayne AR14159 $5,000 $5,025 Eastridge Construction 6/11/2014 $5,025
Sego Coal Mine Reclamation Grand AR14155 $100,000 - $120,000 $73,418 Harrison Oil Field Service 6/2/2014 $100,523
San Francisco Mine Closures Beaver AR14144 $500,000 - $530,000 $381,322 Kent Bethers Construction 5/12/2014 $462,121
Bardon Shaft Closure San Juan AR13131 $48,000 $29,355 Eastridge Construction 6/5/2013 $32,784
Byron Howard Coal Mine Reclamation Emery AR14001 $276,000 $391,999 Kent Bethers Construction 9/9/2013 $401,887
Church/Weber Coal Mine Maintenance Summit AR13155 $126,000 - $140,000 $90,571 Kent Bethers Construction 7/2/2013 $91,611
Kenilworth Stream Channel Maintenance Carbon AR13030 $124,000 $136,483.2 Eastridge Construction 10/22/2012 $136,483.2
Knight-Ideal Coal Loadout Reclamation Carbon AR13022 $1,475,000 $1,190,563 Kent Bethers Construction 10/17/2012 $1,788,326
Silver Reef Mine Closure Maintenance Washington AR13023 $13,500 $9,250 Eastridge Construction 9/24/2012 $10,000
Pondtown Creek II Coal Mine Reclamation Carbon AR13014 $140,000 $135,201 Kent Bethers Construction 9/19/2012 $130,254
Shakespear Coal Mine Reclamation Garfield AR12098 $20,000 $6,502 Eastridge Construction 5/1/2012 $6,192
Bluebell Coal Mine Fire Uintah AR12058 $12,000 $7,740 Kent Bethers Construction 10/25/2011 $7,740
Maclean 3 Coal Mine Fire Carbon AR12025 $375,000 $493,980 Hayward Baker 10/17/2011 $537,902

Inventory & Engineering

"Level-of-Effort" Engineering Services Contract Contract Number Contract Type Contract Duration Contract Start
AECOM 166128 Cost Reimbursement Plus Fixed Fee Five Years November 2015
Spectrum Engineering 166119 Cost Reimbursement Plus Fixed Fee Five Years October 2015
URS Corporation 106000 Cost Reimbursement Plus Fixed Fee 3 year contract w/possibility of 3 one-year extensions July 2009
Spectrum Engineering 106001 Cost Reimbursement Plus Fixed Fee 3 year contract w/possibility of 3 one-year extensions July 2009