Upcoming Projects

Project Name County Project Summary Approx Bid Date
Brown's Park Dagget Closure of approximately 16 hardrock mine openings on public land with backfill, steel grates, and polyurethane foam. Spring 2021
Overland 2 Tooele Closure of apporximately 113 hardrock mine openings on public land with backfill, walls, steel grates, and bat gates. Spring 2021
Topache Peak Phase I Beaver Closure of apporximately 50 hardrock mine openings on public, state, and private land with backfill, walls, steel grates, polyurethane foam, and bat gates. Spring 2021
Mineral Canyon San Juan Closure of approximately 29 uranium mine openings on public and state land with backfill, walls, grates, and bat gates. Spring 2021
Scranton Maintenance Tooele Maintenance repairs of approximately 6 previously closed abandoned mines on public land with backfill and walls. Spring 2021
Rains Canyon Subsidence Carbon Closure of one subsidence hole at an abandoned coal mine with polyurethane foam and backfill. Summer 2021
Byron Howard Refuse Carbon Reclamation of a coal refuse pile by capping with approximately 600 cubic yards of imported fill and soil amendment for revegetation. Summer 2021
Willard Peak Phase II Box Elder/Weber Closure of approximately 35 hardrock mine openings on public and private land with backfill, steel grates and block walls. Fall 2021
Cardiff Fork Salt Lake Closure of approximately 25 hardrock mine openings on private and Forest Service land in Big Cottonwood Canyon with backfill, steel grates and block walls. Fall 2021
Wasatch Maintenance Phase I Salt Lake Maintenance repairs of approximately 10 previously closed abandoned mines on private land in Big and Little Cottonwood Canyons with backfill, walls, and steel grates. Fall 2021
Buckmaster Draw II Emery Closure of approximately 43 uranium mine openings on public and state land with backfill, walls, grates, and bat gates. Fall 2021
Topache Peak Phase II Beaver Closure of apporximately 150 hardrock mine openings on public and private land with backfill, walls, grates and bat gates. Fall 2021
Dividend Phase I Tooele Closure of apporximately 70 hardrock mine openings on private land with backfill, walls, grates and bat gates. Fall 2021
Picacho Peak Phase I Beaver Closure of approximately 182 hardrock mine openings on public and private land with backfill, walls, grates and bat gates. Spring 2022
Dividend Phase II Tooele Closure of apporximately 53 hardrock mine openings on private land with backfill, walls, grates and bat gates. Spring 2022


Awarded Contracts

Construction

Project Name County Bid Number Engineer Estimate Bid Results Awarded To Construction Start Final Contract Amount
Willard Peak Mine Closures Phase 1 Box Elder/Weber JH21-62 $44,000 - $47,000 $49,775 Strong Solutions Fall 2020 $39,250
Temple Mountain Maintenance Emery JH21-49 $16,000 - $18,000 $30,300 Xcavation Company Fall 2020 $29,300
Buckmaster Draw - OIG Mine Closures Emery JH21-36 $220,000 $155,319 Xcavation Company Fall 2020 $158,711
White Canyon and Deer Flat Mine Closures San Juan JH21-19 $450,000 $378,890 5 Seventeen Company Fall 2020 $396,641
Westdip Bat Cupola Tooele JH21-10 $29,000 $24,150 England Construction Fall 2020 $26,050
Cleer Creak Refuse Reclamation Carbon JH21-09 $350,000 $300,357 Harrison Field Services Fall 2020 $164,486
Hiawatha Phase 2, Culvert Maintenance Carbon JH21-03 $150,000 $329,575 Strong Solutions Summer 2020 $326,398
Jacob City Maintenance Tooele AS20-164 $19,000 $16,320 Xcavation Company Spring 2020 $16,320
Spor Mountain Juab MG20039 $675,000 - $750,000 $568,898 Kent Bethers Construction Fall 2019 $598,598
Red and Fry Canyons San Juan MG20013 $531,000-$590,000 $518,898 5 Seventeen Company Fall 2019 $533,237
Big Bend Spring Collection Emery MG20035 $450,000 $533,964 Nelco Fall 2019 $469,977
Sunrise Peak Tooele MG20008 $25,000 $43,699 5 Seventeen Company Summer 2019 $43,699
Honorine Portal Tooele CN19017 $40-45,000 $48,400 Xcavation Company Winter 2018 $49,400
Hiawatha Phase 1 Carbon/Emery MG19016 $175,000 $158,894 5 Seventeen Company Fall 2018 $155,197
Dutch Mountain Tooele CN18207 $300,000 $326,465 5 Seventeen Company Spring 2018 $345,180
Browns Hole San Juan MG19009 $235,000 $234,996 5 Seventeen Company Fall 2018 $234,996
Chief #1 Subsidence Juab CN19032 $220-240,000 $233,426 Nelco Fall 2018 $229,798
Poverty Flat Sevier CN18249 $13,500 $24,445 5 Seventeen Company Summer 2018 $24,445
Prince of Wales Salt Lake CN19015 $50,000 $78,885 5 Seventeen Company Summer 2018 $78,885
Kenilworth Maintenance Carbon CN18177 $1.9-2.1 Million $1,927,151 Nelco Spring 2018 $2,047,362
Trash Canyon Mintenance Carbon CN17061 NA $105,449 Nelco Spring 2017 $137,619
Farnsworth Tooele CN17006 $211,001 - $234,446 $196,657 5 Seventeen Company 9/27/2016 $222,445
Lower Willow Creek Carbon CN17030 $468,000 - $520,000 $313,119 Harrison Oil Field Services 10/31/2016 $310,277
Diamond Gulch East Mine Closure Juab AR16134 $88,000 - $93,000 $85,075 5 Seventeen Company 04/11/2016 $94,820
Copper Ridge Mine Closure Grand AR16092 $75,000 - $85,000 $43,068 5 Seventeen Company 11/16/2015 $44,427
Wolf Den Gilsonite Fire Uintah AR15167 $150,000 - $180,000 $176,119 Harrison Oil Field Service 08/11/2015 $146,336
Morrison Coal Mine Reclamation Sanpete AR15074 $225,000 - $250,000 $181,450 Harrison Oil Field Service 11/17/2014 $205,037
San Rafael Swell South Mine Closures Emery AR15027 $825,000 - $900,000 $727,529 Kent Bethers Construction 10/15/2014 $856,900
Crawford Mountains Mine Closure Maintenance Rich BV15004 $350,000 - $450,000 $295,713 ET Technologies 9/15/2014 $312,894
Foothills Mine Closures Davis, Salt Lake AR15007 $25,000 - $35,000 $48,715 5 Seventeen Company 8/25/2014 $49,395
Paria Coal Mine Closure Garfield AR14174 $7,771 $9,816 5 Seventeen Company 6/24/2014 $9,530
Miners Mountain Shaft Closure Wayne AR14159 $5,000 $5,025 Eastridge Construction 6/11/2014 $5,025
Sego Coal Mine Reclamation Grand AR14155 $100,000 - $120,000 $73,418 Harrison Oil Field Service 6/2/2014 $100,523
San Francisco Mine Closures Beaver AR14144 $500,000 - $530,000 $381,322 Kent Bethers Construction 5/12/2014 $462,121
Bardon Shaft Closure San Juan AR13131 $48,000 $29,355 Eastridge Construction 6/5/2013 $32,784
Byron Howard Coal Mine Reclamation Emery AR14001 $276,000 $391,999 Kent Bethers Construction 9/9/2013 $401,887
Church/Weber Coal Mine Maintenance Summit AR13155 $126,000 - $140,000 $90,571 Kent Bethers Construction 7/2/2013 $91,611
Kenilworth Stream Channel Maintenance Carbon AR13030 $124,000 $136,483.2 Eastridge Construction 10/22/2012 $136,483.2
Knight-Ideal Coal Loadout Reclamation Carbon AR13022 $1,475,000 $1,190,563 Kent Bethers Construction 10/17/2012 $1,788,326
Silver Reef Mine Closure Maintenance Washington AR13023 $13,500 $9,250 Eastridge Construction 9/24/2012 $10,000
Pondtown Creek II Coal Mine Reclamation Carbon AR13014 $140,000 $135,201 Kent Bethers Construction 9/19/2012 $130,254
Shakespear Coal Mine Reclamation Garfield AR12098 $20,000 $6,502 Eastridge Construction 5/1/2012 $6,192
Bluebell Coal Mine Fire Uintah AR12058 $12,000 $7,740 Kent Bethers Construction 10/25/2011 $7,740
Maclean 3 Coal Mine Fire Carbon AR12025 $375,000 $493,980 Hayward Baker 10/17/2011 $537,902

Inventory & Engineering

Contractor Services/Project Contract Number Contract Type Contract Duration Contract Start
Sunrise Engineering Grassy Trail Creek Waterline 216159 Services Rendered Three Years November 2020
Jones & Demille Big Bend Spring Construction Management 1908-377 Services Rendered Five Months September 2019
AECOM "Level-of-Effort" Engineering Services 166128 Cost Reimbursement Plus Fixed Fee Five Years November 2015
Spectrum Engineering "Level-of-Effort" Engineering Services 166119 Cost Reimbursement Plus Fixed Fee Five Years October 2015
URS Corporation "Level-of-Effort" Engineering Services 106000 Cost Reimbursement Plus Fixed Fee 3 year contract w/possibility of 3 one-year extensions July 2009
Spectrum Engineering "Level-of-Effort" Engineering Services 106001 Cost Reimbursement Plus Fixed Fee 3 year contract w/possibility of 3 one-year extensions July 2009

The AMRP does not intend to procure new Level of Effort (LOE) contracts for engineering work after the current contracts expire in November 2020. Funding levels have changed since we last procured LOE contracts and we do not anticipate enough upcoming engineering work to merit new contracts. We instead intend to solicit engineering work on a project-by-project basis as needed.

Vendors interested in competing for these project-specific contracts can register with the State Division of Purchasing and receive notification of solicitations. Please visit the Division of Purchasing website for detailed information.