Task Details:

Permit Number Site Name Task Status Task Type Task Year
C0070042 STAR POINT REFUSE A NOV 2004
Task ID Task Name Request Date Issue Due Date Issue Sent Date
1856 N04-49-3-1 EXCESS HIGHWALLS-IMPROPER MINING METHOD 02/26/2004 03/26/2004 03/26/2004
Last Updated Updated By Manager Remarks By
05/19/2004 SDUNLAP PGRUBAUG Failure to follow the mining methods/operation plan in the approved mining and reclamation plan (MRP); the operator was cutting into the toe of the pile. Improper mining methods resulting in excessive highwalls-approximately 20' of consolidated material. Approximately 80'-100' of unconsolidated material was overlying the consolidated material.

Task Assignments:

Person Assignment Due Date End Date Assigned On Assigned By Remarks By

Task Activies:

Activity Date Activity Remarks Added By Date Added
03/26/2004  Termination  The operator is following the MRPand has submitted a plan to protect the public and to prevent materials from tracking on the public road.   SDUNLAP  03/29/2004 
03/26/2004  Assessment  4 Points, $88.00   SDUNLAP  05/19/2004 
03/26/2004  Assessment Sent  Date assessment was sent out.   SDUNLAP  05/19/2004 
04/15/2004  Check Received  $88.00, Check #90404441   SDUNLAP  05/19/2004 